Introduction Welcome to the Illinois Power Agency website for the Ameren Illinois Utilities 2009 Energy, Capacity and RECs RFPs. This site will serve as the platform for participating in the 2009 Procurement. Each of the RFPs is located on a separate section of the site, designed to aid prospective bidders by providing: information about the procurement process; directions regarding bidder pre-qualification and bid preparation; a forum for asking questions and obtaining answers about the RFPs and the procurement process; and a means for submitting bidder information and bids. The site is constructed to preserve the confidentiality of bidders and information submitted by bidders. Each RFP section of the website consists of two tiers:
This website is managed by Levitan & Associates, Inc. as part of our role as the Illinois Power Agency's Procurement Administrator for the 2009 Ameren Illinois Utilities RFPs. In accordance with the requirements of Section 16-111.5(c)(2) of the Public Utilities Act (220 ILSC 5/16-11.5), the Procurement Monitor, retained by the Illinois Commerce Commission, will also have access to all public and secure information posted to the Web site. Background for the Illinois Power Agency's 2009 Ameren Illinois Utilities RFP The Illinois Power Agency filed the initial Procurement Plan, consistent with Section 16-111.5(j) of the Public Utilities Act (220 ILSC 5/16-11.5), on September 3, 2008, in ICC Docket No. 08-0519. A revised plan was filed on October 20, 2008. The Illinois Commerce Commission approved this revised plan in an order issued on January 7, 2009 (the Final Order). The Final Order is posted in the documents section of this website along with the approved Procurement Plan and related documents filed by the Illinois Power Agency. The Plan outlines the process for acquiring standard wholesale energy products, capacity and renewable energy credits necessary to meet the needs of the eligible retail customers that purchase power and energy from the Ameren Illinois Utilities under fixed-price bundled service tariffs. The products to be procured under this plan cover the period from June 1, 2009, through May 31, 2012. Details regarding each of the products to be procured are specified in the RFP documents contained in the public access areas of each of the RFP sections of this site.
Disclaimer The information contained in this website is presented for the convenience and to aid prospective bidders in the preparation and submittal of bids to the Illinois Power Agency's 2009 Ameren Illinois Utilities Energy, Capacity and Renewable Energy Credits RFPs. This website is not intended to be an exhaustive source for all documents relating to these procurements. Levitan & Associates, Inc., the Procurement Administrator, the Illinois Power Agency and the Ameren Illinois Utilities, individually or jointly, make no representation or warranty, expressed or implied, as to the accuracy or completeness of the information presented herein. Levitan & Associates, Inc. is not responsible for the contents of any third-party sites linked from this site. |
Announcements
Subscribe
Q&A
Contact
E-Mail: aiurfp@levitan.com |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Home | Announcements | Subscribe | Procurement Info | Q&A | Capacity RFP | Energy RFP | RECs RFP | Contact Webmaster |